Fábrica de Sabão
property details · for a Hub House co-operative coliving project

#56 🏅64% REJECT • €270k • historic • village • 2000m² hub for buildout • Historic rural factory with chimney • Not for serious consideration but intersting. Could probably be beaten down to 200k but still expensive so would require a partnership.
Advert #1 • Advert #2 •
Advert #1 • Advert #2 •
Compare all properties
Portugal — near Badajoz, (Lisbon) Google map
☃️4–13–17° 🏖33–40° ☀️16 days 🌧7 days
Environment: dry and rolling agricultural; hiking track (Compostela) on doorstep, but few others, small river 30 mins walk; natural park and river 30mins drive; coast 2h
Services: all, town 25mins drive
Access: station 25mins walk; Badajoz 1h, Lisbon 3h30
Area ✧ plans for conversion to hotel
✦ 4500m2 garden directly in front (south), additional land/groves down to track and across could probably be acquired
✦ 170m2*2==340 house on road
✦ main building 500m2*3==1500 needs floors and roof
✦ 170m2 side building
✦ 350m2 road building
✦ all except house needs new roofs, plus floors, having span of 12m, fine for bonded timber i-beams
✦ once daily bus to Lisbon outward at night and back in the morning (3h30)
✦ once daily train Lisbon–Badajoz (3h30) with a change, out in the morning and back in the evening (inverse of bus); when the AVE reachs there I would expect services to be increased although the new highspeed line will be 1h south
✦ down season might be 1.5 months summer and 1.5 months winter
✦ fiber in Portalagre so if nto allready would soon be available
property detail ↗︎
✦ 4500m2 garden directly in front (south), additional land/groves down to track and across could probably be acquired
✦ 170m2*2==340 house on road
✦ main building 500m2*3==1500 needs floors and roof
✦ 170m2 side building
✦ 350m2 road building
✦ all except house needs new roofs, plus floors, having span of 12m, fine for bonded timber i-beams
✦ once daily bus to Lisbon outward at night and back in the morning (3h30)
✦ once daily train Lisbon–Badajoz (3h30) with a change, out in the morning and back in the evening (inverse of bus); when the AVE reachs there I would expect services to be increased although the new highspeed line will be 1h south
✦ down season might be 1.5 months summer and 1.5 months winter
✦ fiber in Portalagre so if nto allready would soon be available
property detail ↗︎
towards ownership and use in any property
email jacob@hub.house, or join the Whatsapp group